ResiBuySample report
← Go back See your first report →
ResiBuyby Vydrix
A ResiBuy report

See what a property
actually hides.

One report. Fourteen checks: risk, legality, land history, RERA, pricing, power, water, and more. This is a real report, with the project and developer anonymised.

76.7
Overall score
14
Sections analysed
5
Risks surfaced
Verdict Dashboard
Satellite Area Street View
Satellite close view of the project site
76.7 Grade A
Waterfall Residences
by Developer X · 3 Aug 2026 · flat
● Proceed
Safety
Caution
Legal
Verify
Liveability
Good
Financial
Good
Future
Positive
⚠ Risk & Sensitivity ✓ verified signal
● HT line (tower)301m SE
● HT line (tower)314m S
● HT line (tower)515m E
● Cemetery100m NW
● STP700m NE
● Landfill1.2km SW
● Pond1.5km SW
📍 Project price today
₹24,000 /sqft
Overpriced

Given the luxury segment, a reputable developer and a rising price trend, the project appears competitively priced within its market, but sits well above the locality benchmark.

🛡 Safety & riskCaution
HT · flood · sensitive sites
Nearest sensitive siteCemetery 100m NW
HT line301m SE
Water body1.5km
Flood riskLow
📄 Legal & titleVerify
RERA · title · litigation
Prior land useAgricultural / greenfield, extensively converted for residential
RERA statusRERA/REG/2025/1284
LitigationMultiple
🌿 LiveabilityGood
Schools · transit · parks
Schools within 5km20
Hospitals within 5km20
Parks & green spaces0
Road connectivityGood
₹ FinancialGood
Pricing · appreciation
Asking vs market−8%
Appreciation 3-5yr12-18%
Rental yield3.2-4.1%
Negotiation room5-8%
📈 Future outlookPositive
Infrastructure · connectivity
› Southern Peripheral Road (Link)
› Southern Peripheral Road
› Central Peripheral Road
🏛 Developer & RERAVerify
Track record · RERA filing
DeveloperDeveloper X
RERARERA/REG/2025/1284
📋 Before you sign, due diligence
5 checks to run
Water
Request RWA monsoon logs 2022-2025
Reveals real waterlogging history the brochure hides
Legal
Verify RERA registration number
Confirms the project is legally cleared to sell
Power
Ask society for DG backup capacity
Summer power cuts are common in this belt
Legal
Get 12-year title search from advocate
Surfaces ownership disputes and encumbrances
Water
Confirm tanker contract for June-Aug
Borewells often run dry just before monsoon
🤝 Don't do this alone

A ResiBuy expert can walk you through every check above (title search, RERA, site visit, negotiation) before you commit.

Sensitive Sites
⚡ High Tension Lines ⚠ Moderate
220kV+ power infrastructure within 1km of the project
3
Features detected
301 m
Closest distance
tower
Voltage level
Moderate
Health advisory
TowerDistanceDirectionImpact
⚡ tower301mSEMedium
⚡ tower314mSMedium
⚡ tower515mELow
Health advisory
  • Long-term EMF exposure classified "possibly carcinogenic" by WHO (Group 2B).
  • Studies suggest increased childhood leukemia risk within 200m.
  • Min setbacks: 66kV=30m, 220kV=45m, 400kV=60m.
◆ Analyst assessment

Multiple high-tension towers sit within 300-500m (closest 301m SE, 314m S). This proximity raises EMF perception and potential long-term resale-value impact. No verified voltage data was found for the three towers within 800m. Verdict: verify exact voltage of the closest towers. 220kV+ lines present material health and valuation risk.

🛡 Sensitive Sites (2km)
High impact
1
within 500m
Medium impact
1
500m-1km
Low impact
1
1-2km
Total
3
within 2km
SiteTypeDistanceDirImpact
CemeteryCremation / burial ground100mNWHigh
Sewage treatment plantSTP700mNEMedium
LandfillWaste / dumping1.2kmSWLow

Three sensitive sites detected within 2km. A cemetery just 100m NW is the material concern. Close enough to affect daily amenity, sentiment, and resale. An STP 700m NE and a landfill 1.2km SW add odour and environmental risk during certain wind conditions. Verdict: verify buffers, prevailing wind direction, and any planned relocation before committing.

Land History
Land use evolution from 2010 to 2024
Current status
⚠ Planned Development Zone

This parcel sits within a rapidly urbanising, RERA-approved planned sector, attracting significant residential investment.

Land history confidence
45%
Land Risk Score
58/100
Moderate
Geology
Water table
Flood risk
Settlement
Legal risk
Property DNA
Previous use
Agricultural / greenfield, extensively converted for residential
Current type
Planned Dev
Planning zone
✅ Planned Sector
Construction readiness
Medium Risk
Land confidence
45%
Soil profile & geotechnical intelligence
Soil type

Indo-Gangetic alluvium. Quaternary sand, clay and silt with pockets of expansive clay.

Water table

Variable and deep (~30.6 mbgl pre-monsoon). High water tables in the area present a liquefaction risk.

Bearing capacity

Medium. Around 10 t/sq.m at ~1m. Expansive clay can cause differential settlement.

Seismic zone

Zone IV. High Risk.

⚠ For G+20 or higher towers a robust deep-pile foundation is crucial. A detailed geotechnical investigation (soil test) specific to the plot is non-negotiable to assess load-bearing capacity, differential settlement, and chemical attack risk from groundwater salinity.

Buyer risks
Litigation riskHigh
Rehabilitation riskLow
Land transfer riskMedium
Construction delayMedium
Cost escalationMedium
Data confidence meter
45%
Government records✓ Verified
Satellite analysis✓ Verified
Historical maps✓ Verified
News validation✓ Verified
Public sources✓ Verified
Flood Risk Zone
🌊 Flood Risk Zone Low Risk
Flood risk level
Low Risk
Minimal flood impact
Waterlogging events
1
Reported 2023-2024
Max waterlogging
2-4 Hrs
During heavy rainfall
Monsoon impact
Low
Localized & short
Key insights
  • 1 water body within 2km of the project (nearest 1.49km SW).
  • No major drains flagged nearby.
  • Severe waterlogging reported in the city during major flood days.
  • Localized stagnation possible during heavy monsoon.
Road Infrastructure
Overall road score
3.6/10
Poor
Connectivity
3.6/10
Poor
Road quality
3.6/10
Poor
◆ Key access & connectivity
RoadTypeQuality
🛣 TertiaryTertiary★★★☆☆ 6/10
🛣 ResidentialResidential★★★☆☆ 5/10
🛣 ServiceService★★☆☆☆ 4/10
🛣 TrackTrack★☆☆☆☆ 2/10
🛣 PathPath★☆☆☆☆ 1/10

Connectivity score of 3.6/10 alongside predominant tertiary and unpaved 'track' roads signals poor last-mile access within the sector. Verdict: conduct a focused site visit during peak traffic and post-rain to personally assess last-mile connectivity and road quality.

Future Development
🛰 Future Development Outlook Cautiously Positive
DevelopmentImpact on valueTimelineScore
Southern Peripheral Road (Link)Significantly improves connectivity, boosting demand and value.Expected 2024★★★★★
Southern Peripheral Road8-lane signal-free mobility corridor; drives residential & commercial growth.Ongoing★★★★★
Central Peripheral RoadConnects the expressway with NH-8; improves regional access.Opened 2023★★★★★
Industrial corridor impactFuels infrastructure and residential demand across the region.Ongoing★★★★☆
Metro expansionEnhances access to business hubs and the airport along key corridors.Expected 2027★★★★★
⚠ Drainage & waterloggingDrain project delayed; potential continued waterlogging in heavy monsoon.Completion 2025▲ Concern
⚠ High-tension power linesRemoval of lines over residential colonies ongoing; can affect value.Ongoing▲ Concern
Impact summary
Connectivity★★★★★
Infrastructure★★★★★
Employment★★★★☆
Livability★★★☆☆
Appreciation 5-8y★★★★★
Impact guide

★★★★★ Very high · ★★★★ High · ★★★ Medium · ★★ Low · ▲ Risk / concern. Scores weigh proximity, timeline certainty, and demonstrated impact on comparable corridors.

Developer Profile Analysis
Developer analysis snapshot
Developer X
CIN withheld (sample) · researched 2026-07-18
Reliability read: Moderate

Active litigation and complaints present. This snapshot reports presence and severity, not exact counts.

Company & entityHigh confidence
Legal nameDeveloper X
Incorporated1987
Registered officeWithheld (sample)
Listed onBSE / NSE
Board12 directors
Financial snapshotVerified
Revenue₹62,400 M
Net worth₹3,18,000 M
Gross debt₹74,000 M
Credit ratingAA (Stable)
Operating performanceVerified
Pre-sales₹14,200 Cr
Collections₹9,600 Cr
Annuity income₹4,100 Cr
Rental portfolio34 M sq ft
RERA complaintsModerate
Multiple
  • possession delays
  • judicial scrutiny
  • complaints across projects
  • refund disputes
Key projectsHigh confidence
Aurelia Greens
Skyline Meridian
Emerald Crest
Vantage One
Nova Parkview
Illustrative names, not real projects
Legal & litigationModerate
Multiple
  • regulatory penalties
  • competition-law scrutiny
  • buyer disputes
  • RERA complaints
Checked: NCLT, High Court, consumer forums
Credit ratingVerified
AA (Stable)
Dec 2025 · illustrative

Strong financial profile, healthy cash flow, ongoing deleveraging.

RERA Intelligence
3 phases registered Transparency 65%
7.5/10
Good

Strong brand credibility and high demand, but verify the possession timeline given a 6-year extension and the developer's litigation history.

Quick facts
LocationWithheld (sample)
PossessionProposed 2028 · Revised 2034
DeveloperDeveloper X
Total units1,164
Items to verify8
Registered phases
Phase 1 (main)
RERA/REG/2025/1284
Registered 2025 · Possession Mar 2034 (revised from Jan 2028)
Phase 2
RERA/REG/2024/0946
Registered 2024 · sister phase
Phase 3
RERA/REG/2023/0574
Registered 2023 · earliest phase
🏠 Unit mix
4 BHK720 units
Super 3,950-3,977 sq ft
₹9.5-9.7 Cr indicative
5 BHK384 units
Super 7,714 sq ft
₹18.5 Cr indicative
Penthouses60 units
Super up to 7,800 sq ft
₹19 Cr+ indicative
720 + 384 + 60 = 1,164 units across 6 towers. Indicative pricing at ₹24,000 per sq ft.
👥 Best fit for
Long-term end-use (5+ yr)
Suitable
Capital-appreciation investors
Verify first
Short-horizon resale
Considerations apply
NRI investors
Suitable
📊 Due diligence scorecardOverall 3.8 / 5
RERA Developer Financial Approvals Timeline Strength
RERA compliance4/5

All 3 phases registered with valid RERA numbers; possession-timeline transparency could improve.

Developer credibility4/5

Established developer with strong brand equity, but recent litigation creates reputational concerns.

Financial transparency3/5

Headline financials disclosed; project-level cost and funding structure still limited.

Approval completeness5/5

Building plan, environment, fire and airport-height approvals all provided.

Construction timeline3/5

Possession revised by several years; revised date disclosed, but execution risk remains.

Sector strength4/5

Strong price appreciation and high demand, with premium positioning and NRI interest.

✅ Statutory approvals
Environment clearanceEC/2024/8842
Airport height clearanceNOC/2024/5517
Fire scheme approvalFS/2025/2043
Building plan approvalBP/2025/16204
🚨 Red flag radar
● Red flag
Regulatory probe on a related project

A probe into another project by the same developer indicates potential execution and commitment issues. Request written confirmation this project has no similar irregularities.

● Watch
Refund case at appellate tribunal

An appeal was dismissed over a mandatory pre-deposit. Verify current compliance status and the pattern of refund cases against the developer.

● Red flag
Possession extended by 6 years

Proposed 2028, revised to 2034. Request a monthly construction timeline, third-party certification, and penalty clauses for further delay.

● Red flag
RERA possession date slipped 2 more years

The latest RERA amendment moved the registered completion date back by a further 2 years. Confirm the current registered possession date on the state RERA portal and get delay-penalty terms in writing before booking.

Price Intelligence
📍 Project price today
₹24,000 /sq.ft
Overpriced

Pricing is robust across major portals. Explicit median prices, detailed year-on-year trends, and official analyst CAGR forecasts are not consistently stated.

🏆 Top comparable projects
ProjectPrice / sqft
Aurelia Greens · premium₹34,900
Skyline Meridian₹14,160-15,500
Emerald Crest₹13,421-13,425
Nova Parkview₹11,700-12,000
Vantage One₹12,920
Zenith Terraces₹13,150
Locality price history · market average (₹/sqft) +35% since 2021
₹9.6k
2021
₹10.4k
2022 +8%
₹11.3k
2023 +9%
₹12.2k
2024 +8%
₹13.0k
2025 +7%
Year-on-year: +8% · +9% · +8% · +7%, roughly an 8% annual (CAGR) rise, in line with a maturing sector rather than a speculative spike.
Market positioning
This project
₹24,000
Overpriced
Locality market avg
₹13,000
2025 benchmark
Premium
+85%
vs market
★ Overall verdict

Suitable for both investors (long-term growth potential despite high current valuation) and end-users (premium living if budget aligns with luxury pricing).

📡 Sector demand signals
Avg price / sqft
₹11,800-14,600
3-yr trend
+22% to +30%
Demand
High
Rental yield
3.2% - 4.1%
Electricity Reliability
⚡ Electricity Reliability High Risk
Overall reliability score
4.2/10

A past 220kV transformer substation fire caused widespread outages in the area.

Outage trend (12 months)
Grid stability
Variable
DG backup
Unknown
Last major outage
Recent
Peak demand impact
Medium
Provider
State DISCOM
Reliability risk
High Risk
AI verdict: high risk reliability

A past 220kV substation fire caused widespread outages, signalling grid fragility that affects critical infrastructure. Verify DG backup capacity and common-area power continuity before booking.

Water Supply
💧 Water Supply Moderate
Availability
Moderate
Primary source
Tanker
Reliability
Stable
Status
Normal
Daily hours
8+ Hrs
Cost impact
Moderate
Water reliability score
5.5/10 · Fair
Verdict, Moderate

The area sits near the end of the municipal water network, with routine reliance on private tankers. Budget for ongoing tanker costs and verify building-level storage and backup before purchase.

Traffic Commute Analysis
🚗 Traffic Commute Analysis
Live traffic insights & commute-time estimation.
Time
MorningEveningOff PeakNight
Day
WeekdayWeekend
Estimated commute · weekday morning peak (9-10 AM)
DestinationDistanceDrive timeTraffic
Cyber City, Gurugram16.4 km42 minHeavy
DPS Sushant Lok12.8 km31 minModerate
Golf Course Road14.1 km34 minHeavy
MG Road, Gurugram15.0 km36 minHeavy

Off-peak drive to Cyber City drops to ~26 min; evening peak rises to ~48 min. Metro access along the SPR corridor is expected to ease the Cyber City run by 2027.

Amenities
🏙 Amenities
Total
60
Avg rating
4.5/5
Max distance
4.9 km
🎓 Schools (within 5km) 20 ● Good
NameDistanceRating
Vega Schools, Sector 761.0km
Narayana e-Techno School1.6km★ 4.5
Kunskapsskolan International School1.7km
Government Senior Secondary School1.9km
Suraj School2.4km
Sri Chaitanya School2.7km
🏥 Hospitals (within 5km) 20 ● Good
NameDistanceRating
Nouveau Medics, Multispecialty OPD & Diagnostics2.3km★ 4.7
The Little's Clinic2.3km★ 4.9
Apollo Pharmacy, Sector 822.3km★ 2.9
FACT Healthcare2.4km★ 4.8
Dr Lal PathLabs2.5km★ 4.7
Kinder Clinic Sapphire 832.6km★ 4.9
🛒 Supermarkets (within 2km) 20 ● Good
NameDistanceRating
Veggies Bucket839m★ 5
Grocery Store875m★ 5
Right Mart878m★ 3.7
Chaudhari Phool Singh Fauji Market1.1km★ 4.3
Bhoomi Grocery Store1.1km★ 5
Green Basket Grocery Store1.2km★ 5
Unit Analysis
📕 Named project Villa / Plot / Builder floor
Your unit · brochure uploaded ✓
Tower B · Flat 401
NE facing (STP + highway side) · 4th floor · 4 BHK · super area 3,950 sq ft
Caution

Unit-specific audit. It combines the uploaded brochure (tower config, carpet area, amenity layout) with this report, then answers each check for your exact flat.

💨 Odor drift risk● High

This flat faces the STP directly (700m NE). At a low floor like the 4th, on still and humid monsoon nights, odour drift onto your balcony and NE rooms is likely. This is one of the worst placed faces for smell in the project. A unit on the opposite face, or well above the 12th floor, would cut it sharply.

⚡ HT line EMF risk● Medium

A high-tension tower sits about 300m off this same face. It clears the 45m statutory setback, so it is not a hard hazard, but facing it directly adds a perceived EMF and resale drag on top of the noise and odour already on this side. Lower floors are partly screened by the boundary wall.

🚗 Highway noise● High

A highway runs adjacent on the side Tower B faces, so this flat takes direct traffic noise and road dust. At the 4th floor, close to the carriageway, expect a high and near constant noise floor, worst at morning and evening peaks. Double glazing helps but will not fully offset an adjacent highway on a low floor.

🌊 Flood & waterloggingLow

Sector flood risk is Low and the 4th floor sits well clear of ground level pooling (max 2-4 hrs in heavy rain). Do confirm Tower B basement parking and lift lobby drainage, since that is where water collects first.

📐 Carpet vs super areaVerify

Brochure super area is 3,950 sq ft. At a typical 38% loading, usable carpet is roughly 2,450 sq ft. Get the RERA carpet area in writing. Anything under about 2,350 sq ft means you are paying for more common area than the norm.

🚪 Gate & amenity proximityGood

Per the brochure layout, Tower B sits near the clubhouse and the second gate, so pool, gym and visitor parking are a short walk. The trade off for a low floor is more evening footfall and amenity deck noise.

🪟 View & sunlightGood

SE facing gives strong morning light and good cross ventilation, well suited to this climate. At the 4th floor the sightline is partly onto the podium and the facing tower; the open view opens up above roughly the 8th floor.

📈 Resale & rental outlookPositive

This unit rides the sector's roughly 8% annual trend plus the SPR and CPR connectivity upside. Expect 12-18% appreciation over 3-5 years and a 3.2-4.1% rental yield. The 301m tower on your face is the one point a sharp buyer will negotiate at resale.

You asked

"Will the 4th floor facing the STP be enough to avoid the smell during monsoon?"

No, not really. This face points straight at the STP (700m NE), so on still, humid monsoon nights odour drift onto your rooms is likely, and a low floor makes it worse. If smell is a dealbreaker, look at a unit on the opposite face or above roughly the 12th floor, and confirm the STP is covered and aerated. Sealed NE windows and double glazing help, but only partly on this face and floor.

Questions to ask before you buy

Take this list to your next meeting with the sales team. Each question maps to a specific gap or red flag in this report.

⏱ About the delay
  • Why has the RERA possession date slipped, and what caused the latest 2-year revision?
  • What penalty clauses protect me against further extensions beyond the revised date?
  • What is the current construction status, with third-party engineer certification?
💰 About money
  • What is the total project cost breakdown, and the debt-to-equity ratio?
  • What escrow mechanism protects buyer payments until construction milestones are met?
  • What is the payment schedule linked to construction stages, with evidence of milestones done?
🤝 About JV / structure
  • Is this developed solely by the developer or through a joint venture? If JV, what is the ownership split?
  • What is each partner's financial contribution and role in execution and delivery?
  • Who holds the land title, and is it clear of encumbrances?
📜 About history
  • How does the developer explain the regulatory probe on a related project?
  • Was the pre-deposit in the refund case made, and what is the current appeal status?
  • Can all statutory approvals be shown as current and valid today?
🤝 Don't do this alone.

A ResiBuy expert can sit with you through this list, verify each answer against the RERA portal and filings, and negotiate on your behalf before you commit.

This is what your report looks like.

Run one on any project before you sign. Flat 50% off, this month only.

Get your report, ₹899 ₹449 →